Project contained:
- location of reclamated area,
- hydrogeological conditions, morphology and hydrography of reclamated area,
- geological structure of reclamated area,
- changes in natural environment caused by industrial activity,
- list of non-hazardous wastes qualified to the project together with description of their physical and chemical properties,
- scale of impact of accepted solution on the environment,
- designed directions of reclamation and land development,
- description of initial works before starting essential reclamation activities,
- design solutions of technical reclamation,
- design solutions of biological reclamation,
- way of monitoring reclamated area and the directly neighboring grounds,
- graphic part presenting through charts and profiles proposed solutions of reclamation,
- graphic and photographic specification presenting the area before starting reclamation works.
Period of time for carrying out the project: II quarter 2003