Reclamation Project for Chemical Plant "ROKITA" S.A.

Project contained:

  • location of reclamated area,
  • hydrogeological conditions, morphology and hydrography of reclamated area,
  • geological structure of reclamated area,
  • changes in natural environment caused by industrial activity,
  • list of non-hazardous wastes qualified to the project together with description of their physical and chemical properties,
  • scale of impact of accepted solution on the environment,
  • designed directions of reclamation and land development,
  • description of initial works before starting essential reclamation activities,
  • design solutions of technical reclamation,
  • design solutions of biological reclamation,
  • way of monitoring reclamated area and the directly neighboring grounds,
  • graphic part presenting through charts and profiles proposed solutions of reclamation,
  • graphic and photographic specification presenting the area before starting reclamation works.

 
Period of time for carrying out the project: II quarter 2003